Resource Type

Journal Article 102

Year

2024 1

2023 2

2022 4

2021 1

2019 4

2018 3

2017 3

2016 10

2015 1

2014 4

2013 2

2012 6

2011 21

2010 7

2009 3

2008 3

2007 5

2006 2

2005 4

2004 5

open ︾

Keywords

arch dam 6

dam 6

earthquake 5

concrete dam 3

concrete face rockfill dam 3

Dam 2

Dam safety 2

cracking 2

dam safety 2

3D model 1

AHP method 1

ANFIS 1

ANSYS 1

Air entrainment 1

Arch dam overall safety 1

Balaroud Dam 1

Barcelona Basic model (BBM) 1

Bearing 1

Block stability 1

open ︾

Search scope:

排序: Display mode:

Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane

Peter TSCHERNUTTER

Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1,   Pages 63-70 doi: 10.1007/s11709-010-0016-3

Abstract: shell by means of an embankment dam of medium height.Laboratory as well as field tests on solid rock-fill material were performed before the beginning ofDuring the construction the properties of the available rock-fill changed from solid to soft materialsThis gave rise to the necessity of adjusting the dam design of the downstream dam shoulder.and downstream dam shell were observed during construction and operation.

Keywords: embankment dam     bituminous concrete membrane     rock-fill material properties     deformation behavior    

and application of the real-time monitoring system for filling construction process of high core rock-filldam

Cui Bo,Hu Lianxing,Liu Donghai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 91-96

Abstract:

In this paper, on the basis of research on high core rock-fill dam fillingprocess monitoring is determined; the solution scheme is proposed; the monitoring system of core rock-fillrolling on dam surface.The monitoring system is applied in the construction field of the highest earth rock-fill dam in Asia, Nuozhadu core rock-fill dam, as the core component of the construction process control architecture

Keywords: high core rock-fill dam     filling construction process     real-time monitoring     transportation to dam     rollingon dam surface     development and application    

Evaluation method of dam behavior during construction and reservoir filling and application to real dams

Yuji KOHGO, Akira TAKAHASHI, Tomokazu SUZUKI,

Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1,   Pages 92-101 doi: 10.1007/s11709-010-0009-2

Abstract: In this paper we analyzed a real fill-type dam, named the Minami-Aiki Dam, to verify a numerical consolidationThis method is valid for estimating behavior of fill-type dams during construction and impounding.

Keywords: fill dam     consolidation analysis     unsaturated geo-materials     impounding     construction    

Theory and application of construction simulation for roller compaction of high core rock-fill dam

Zhong Denghua,Zhao Chensheng,Zhang Ping

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 28-32

Abstract: ="text-align: justify;">Based on the overall analysis of roller compaction system of high core rock-filldam, the theory of construction simulation for roller compaction is put forward and the simulation modelis set up which can actually reflect the uncertainties of the rock-fill dam roller compaction to ensureachievement has been applied to the filling unit construction process of the Nuozhadu high core rock-filldam to verify the reliability of the simulation model, which gives important guidance to the project

Keywords: high core rock-fill dam     roller compaction     construction simulation    

Analysis on damage causes of built-in corridor in core rock-fill dam on thick overburden: A case study

Jia’ao YU; Zhenzhong SHEN; Zhangxin HUANG

Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 6,   Pages 762-780 doi: 10.1007/s11709-022-0847-8

Abstract: The stress state of the built-in corridor in core rock-fill dam on thick overburden is extremely complexinvestigate the effect of thick overburden on the stress and deformation of the built-in corridor in a rock-filldam, and ascertain the damage causes of the corridor.And the calculation model considering dam construction process, contact between concrete and surrounding

Keywords: thick overburden     built-in corridor     stress     deformation     causes for damage     concrete damaged plasticity    

Key technologies of real-time construction control for major hydraulic and hydroelectric projects

Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai

Strategic Study of CAE 2011, Volume 13, Issue 12,   Pages 20-27

Abstract: ">The quality control and schedule control are the significant technical problems in high core rock-filldam and high concrete dam construction.conventional quality control methods exhibit difficulty to ensure construction quality of high core rock-filldam and to control timely schedule of high concrete dam under high-intensity continuous constructionReal-time compaction quality monitoring technology of high core rock-fill dam, real-time entire-process

Keywords: high core rock-fill dam     high concrete dam     construction quality     construction schedule     real-time monitoring     digital dam    

Study on the Model and Its Visualization for Dynamic Allocation of Earth

Hu Chengshun,Zheng Denghua,Zhang Jin,Hong Wen,Li Mingchao

Strategic Study of CAE 2003, Volume 5, Issue 12,   Pages 73-79

Abstract: significance to reduce the project cost and ensure the construction period in the construction of rock-filldam.At last a large-scale rock-fill dam is illustrated.

Keywords: rock-fill dam construction     earth allocation     dynamic allocation     linear programming     visualization    

Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland

M. WIELAND, G.F. KIRCHEN

Frontiers of Structural and Civil Engineering 2012, Volume 6, Issue 1,   Pages 76-83 doi: 10.1007/s11709-012-0144-z

Abstract: The 130 m high Punt dal Gall dam is located at the Swiss-Italian border in the South-eastern part ofThe dam is founded on highly folded and partially crushed dolomite and limestone formations.For the monitoring of the dam deformations five inverted pendulums were installed in the dam and threein the rock foundation of the right abutment outside of the dam.The paper describes the long-term safety monitoring of this 42 years old arch dam.

Keywords: dam safety concept     arch dam     dam instrumentation     dam safety monitoring    

China's High Dams Construction and Research on Science and Technology

Chen Zongliang

Strategic Study of CAE 2000, Volume 2, Issue 12,   Pages 84-89

Abstract: The scientific and technological achievements and their application in geologic exploration, dam construction, flood discharging and energy dissipation, treatment of dam foundation and treatment of high rock slopeThey in elude the 181 m-high concrete gravity dam in the Three Gorges Project, the 240 m — highCFRD, the 233 m~high Shuibuya CFRD, the 130 m- high Shapai RCC arch dam, the 131 m- high Jiangya RCCgravity dam, etc.

Keywords: hydroelectric power     high dam     gravity dam     arch dam     roller compacted concrete dam (RC-CD)     concrete facerockfill dam (CFRD)    

Features of seismic hazard in large dam projects and strong motion monitoring of large dams

Martin WIELAND,

Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1,   Pages 56-64 doi: 10.1007/s11709-010-0005-6

Abstract: Earthquakes can affect large dam projects in many different ways.Among these dams were the 132-m-high Shapai RCC arch dam and the 156-m-high Zipingpu concrete face rockfilldam.These recently completed dams are dam types which, up to now, have not experienced strong ground shaking

Keywords: seismic hazard     arch dam     concrete face rockfill dam     strong motion instrumentation     reservoir-triggered    

Key problems and solutions in arch dam heightening

Zuoguang FU, Yunlong HE, Sheng SU

Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 1,   Pages 98-104 doi: 10.1007/s11709-010-0004-7

Abstract: The dam heightening, which is an effective way to increase reservoir volume, has been paid close attentionThree problems should be dealt with when an arch dam needs to be heightened: stress state getting worseat dam heel, cracking on new added concrete dam surface, and weak bonding between new added concreteand old dam.The tensile stresses on dam’s surface and joint face that have certain relations to the dam heightening

Keywords: arch dam     heighten     tensile stress     finite element method    

Analysis of arch dam deformations

Franz PERNER, Pius OBERNHUBER,

Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1,   Pages 102-108 doi: 10.1007/s11709-010-0012-7

Abstract: Predicting “regular” dam deformations for prevailing conditions and comparing them with observeddeformations is an essential part of dam surveillance.Prediction of dam deformations can be based on deterministic models, purely statistical models or so-calledand the portion caused by temperature variation.The present article deals with the analysis of arch damprocedure is employed for the analysis of the deformations of the 186 m high Zillergruendl arch dam

Keywords: arch dam     analysis     Zillergruendl     concrete temperature     hybrid model    

The Cemented Material Dam: A New, Environmentally Friendly Type of Dam

Jinsheng Jia, Michel Lino, Feng Jin, Cuiying Zheng

Engineering 2016, Volume 2, Issue 4,   Pages 490-497 doi: 10.1016/J.ENG.2016.04.003

Abstract:

The first author proposed the concept of the cemented material dam (CMD) in 2009.This concept was aimed at building an environmentally friendly dam in a safer and more economical wayfor both the dam and the area downstream.The concept covers the cemented sand, gravel, and rock dam (CSGRD), the rockfill concrete (RFC) dam (or the cemented rockfill dam, CRD), and the cemented soil dam (CSD).

Keywords: Cemented material dam (CMD)     Cemented sand,gravel,and rock dam (CSGRD)     Rockfill concrete (RFC) dam     Cementedrockfill dam (CRD)     Cemented soil dam (CSD)     Material properties    

Hongshiyan Landslide Dam Danger Removal and Coordinated Management

Ning Liu

Frontiers of Engineering Management 2014, Volume 1, Issue 3,   Pages 308-317 doi: 10.15302/J-FEM-2014041

Abstract: This paper takes an overview of the Hongshiyan landslide dam triggered by an earthquake near Ludian County

Keywords: the Zhaotong Ludian earthquake     danger removal of the landslide dam     coordinated management    

Research on key construction technologies of concrete dam heightening project

Zhou Hougui

Strategic Study of CAE 2012, Volume 14, Issue 7,   Pages 87-92

Abstract:

Based on construction practice of worldwide concrete dam heightening project, 4 key construction technologiesof concrete gravity dam heightening project by the integral heightening mode on the existing dam bythe down stream side and on the dam crest were systematically summarized.

Keywords: construction technology     dam heightening     concrete dam     hydraulic and hydropower engineering    

Title Author Date Type Operation

Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane

Peter TSCHERNUTTER

Journal Article

and application of the real-time monitoring system for filling construction process of high core rock-filldam

Cui Bo,Hu Lianxing,Liu Donghai

Journal Article

Evaluation method of dam behavior during construction and reservoir filling and application to real dams

Yuji KOHGO, Akira TAKAHASHI, Tomokazu SUZUKI,

Journal Article

Theory and application of construction simulation for roller compaction of high core rock-fill dam

Zhong Denghua,Zhao Chensheng,Zhang Ping

Journal Article

Analysis on damage causes of built-in corridor in core rock-fill dam on thick overburden: A case study

Jia’ao YU; Zhenzhong SHEN; Zhangxin HUANG

Journal Article

Key technologies of real-time construction control for major hydraulic and hydroelectric projects

Ma Hongqi,Zhong Denghua,Zhang Zongliang,Sun Yujun,Liu Donghai

Journal Article

Study on the Model and Its Visualization for Dynamic Allocation of Earth

Hu Chengshun,Zheng Denghua,Zhang Jin,Hong Wen,Li Mingchao

Journal Article

Long-term dam safety monitoring of Punt dal Gall arch dam in Switzerland

M. WIELAND, G.F. KIRCHEN

Journal Article

China's High Dams Construction and Research on Science and Technology

Chen Zongliang

Journal Article

Features of seismic hazard in large dam projects and strong motion monitoring of large dams

Martin WIELAND,

Journal Article

Key problems and solutions in arch dam heightening

Zuoguang FU, Yunlong HE, Sheng SU

Journal Article

Analysis of arch dam deformations

Franz PERNER, Pius OBERNHUBER,

Journal Article

The Cemented Material Dam: A New, Environmentally Friendly Type of Dam

Jinsheng Jia, Michel Lino, Feng Jin, Cuiying Zheng

Journal Article

Hongshiyan Landslide Dam Danger Removal and Coordinated Management

Ning Liu

Journal Article

Research on key construction technologies of concrete dam heightening project

Zhou Hougui

Journal Article